PrimeWater Mabalacat City (as monitored by Mabalacat City Water District)
Availability:
Mon - Fri, 8:00 AM – 5:00 PM
(No noon break)
7:00 AM – 4:00 PM
(With noon break)
7:00 AM – 4:00 PM
(With noon break)
7:30 AM – 4:30 PM
(With noon break)
External Services
-
1. New Service Connection (NSC)
-
Stage 1: Inquiry / Survey / Contract Printing
- Office or Division: Customer Service Division, Finance Department (Cashiering Section), Engineering Department (NSC Section)
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All interested residents, commercial establishments, and government entities within the service coverage area of Mabalacat City Water District and PrimeWater Mabalacat.
Checklist of Requirements
Residential
- Photocopy of one (1) valid ID
- Proof of Ownership (Land Title or Deed of Sale)
- Barangay Certification for water service connection
Commercial
- Photocopy of one (1) valid ID
- Photocopy of Land Title or Notarized Lease Contract (if tenant/lessee)
- Business Permit / Mayor’s Permit / DTI Registration
- Barangay Certification
Government
- Photocopy of Company ID
- Authorization from Head of Office
- Barangay Certification for water service connection
Where to Secure:
Applicant
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Applicant personally applies for New Service Connection at the Customer Service Division, queue in if needed
Interviews applicant and input applicant’s complete information on Customer Services Utilities Management System (CSUMS).
None 10 minutes Customer Service Specialist Provide the appropriate checklist of NSC requirements depending on the location and type of application
None 2 minutes Customer Service Specialist Give necessary information regarding survey schedule & answer all customer queries on the application process
None 5 minutes Customer Service Specialist CSS forwards application to Customer Service Supervisor
None 2 minutes Customer Service Specialist From Head of Customer Services Section, Surveyor receives application form, records and distributes to surveyor (per designated area) and schedule for site inspection
None 5 minutes - Head of Customer Services Section
- Field Surveyor
Surveyor conducts site inspection and accomplish Cost of Fittings and Materials Form (CFMF)
None 30 minutes Field Surveyor Surveyor conducts site inspection and accomplish Cost of Fittings and Materials Form (CFMF)
None 30 minutes Field Surveyor Surveyor submits CFMF to Field Services Supervisor for review, approval and closure of job order at the CSUMS
None 5 minutes - Field Surveyor
- Field Service Supervisor
Field Service Supervisor submits approved CFMF to Head of Customer Services Division for review and final approval
None 5 minutes - Field Service Supervisor
- Head of Customer Services Division
Distributes all approved CFMF to respective offices (Main & Sub-Offices)
None 5 minutes Customer Service Specialist Applicant presents the requirements
CSS evaluates the completeness and validity of all requirements. If complete, gets the CFMF and proceeds to the processing of the NSC application
None 3 minutes Customer Service Specialist CSS creates a ticket and job order for installation and posts appropriate charges and print out NSC contracts
None 10 minutes Customer Service Specialist Applicant receives payment slip
CSS prepares payment slip and issue to applicant for payment to the cashier
None 1 minute Customer Service Specialist Applicant proceeds to Cashier, presents payment slip bearing all charges listed on the CFMF
Cashier receives payment slip and issue Official Receipt (OR)
- Registration and Application
- Residential / Government: P800.00
- Commercial: P1,500.00
- Cost of fittings and materials (determined upon actual survey)
- Miscellaneous Fees: P345.00
- Boring Fee: P1,000.00
- Breaking & Restoration Fee: P500.00 / l.m.
- Excavation Fee (in excess of 10 l.m.): P10.00 / l.m.
5 minutes Cashier Applicant presents O.R. to CSS and signs printed NSC contracts
CSS hand over the NSC Contract to applicant for signature
None 2 minutes Customer Service Specialist CSS double checks all the pages of the signed contracts including pertinent documents attached None 1 minute Customer Service Specialist CSS forwards the processed contract with corresponding attachments to Head of CS Section including the Job Order for Installation for checking and logging
None 1 minute - Customer Service Specialist
- Head of Customer Services Section
Head of CS Section forwards the NSC contracts to CS Division Head for signature. Job Order for Installation will be forwarded to the Lead man of Meter Maintenance/NSC Section for scheduling
None 2 minutes - Head- CS Division
- Head- CS Section
- Lead Man- Meter Maintenance, NSC Section
Estimated Total Processing Time: 2 to 3 Working Days -
Stage 2: Installation
- Office or Division: Customer Service Division and Engineering Department (NSC Section)
- Classification: Simple/Complex
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All interested residents, commercial establishments, and government entities within the service coverage area of Mabalacat City Water District and PrimeWater Mabalacat.
Checklist of Requirements
Residential
- Photocopy of one (1) valid ID
- Proof of Ownership (Land Title or Deed of Sale)
- Barangay Certification for water service connection
Commercial
- Photocopy of one (1) valid ID
- Photocopy of Land Title or Notarized Lease Contract (if tenant/lessee)
- Business Permit / Mayor’s Permit / DTI Registration
- Barangay Certification
Government
- Photocopy of Company ID
- Authorization from Head of Office
- Barangay Certification for water service connection
Where to Secure:
Applicant
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Lead man of NSC Section schedules Maintenance personnel for the actual setting-up of the NSC application
None - 2 to 3 working days (simple works)
- 3 to 5 working days (NSC w/ breaking/excavation, boring, restoration)
Lead Man- Meter Maintenance, NSC Section Liaison Aide closes the job order for installation and inputs in the CSUMS the Meter number, meter brand, date installed and personnel who installed the meter
None 5 minutes Liason Aide Accounts Officer assigns Account number to the newly installed water service connection
None 3 minutes Billing Accounts Officer Estimated Total Processing Time: 2 to 5 Working Days
-
Stage 1: Inquiry / Survey / Contract Printing
-
2. Payment of Water Bill
- Office or Division: Customer Service Division, Finance Department (Cashiering Section), Engineering Department (NSC Section)
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: Active Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat.
Checklist of Requirements
- Statement of Account (SOA) or provides any account information (Account Number, Account Name)
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer presents Statement of Account or provides any account information (Account Number, Account Name) and gives payment.
Cashier verifies outstanding bill, accepts payment and issues Official Receipt (OR)
Actual Bill Presented 2 minutes Cashier Receives and checks OR. Count loose change, if any.
Customer Cashier provides and explains to customer the Customer Satisfaction Feedback Form (CSFF).
None 4 minutes Cashier Customer fills up CSFF Cashier receives accomplished CSFF. Drop to suggestion box.
None 4 minutes Cashier Estimated Total Processing Time: 6 minutes -
3. Reconnection of a Padlocked Water Service Connection
- Office or Division: Customer Service Division and Finance Services Department (Cashiering Section)
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All Disconnected Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat w/ padlocked water service connection.
Checklist of Requirements
- Statement of Account (SOA) or provides any account information (Account Number, Account Name)
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer presents Statement of Account (SOA) to the Customer Service Specialist (CSS) for Reconnection.
- CSS checks the General Ledger for the date of disconnection, water bill arrears and other unpaid fees (if any) of the customer. If account is disconnected on the same day, only the total amount of water bill must be settled, reconnection fee is waived.
- If the customer requests for reconnection and pays after the disconnection date onwards, CSS should inform the customer of the Php200 reconnection fee on top of the water bill arrears.
- Total amount of Water Bill arrears
- Total amount of Water Bill arrear + P200.00 Reconnection Fee
2 minutes Customer Service Specialist CSS creates a ticket and makes a Job Order for reconnection; and charge the reconnection fee, if applicable. (Go to File- Click Ticketing and Create Job Order for Reconnection).
None 2 minutes Customer Customer Presents payment slip to the cashier and pay the total amount
After creating the ticket and printing the job order, CSS gives payment slip to the customer on the total amount they need to pay to be presented to the cashier.
Total amount as per Payment Slip issued
2 minutes - Customer Service Specialist
- Cashier
CSS signs on the printed Job Order for reconnection. CSS checks and indicates the OR Number on the Job Order.
None
2 minutes Customer Service Specialist After payment, CSS will change the status of the account from “DISCONNECTED” to “ACTIVE” in the system.
None
1 minute Customer Service Specialist CSS informs the customer that water service connection will be reconnected between 3:00 p.m. to 5:00 p.m. of the same day by the Field Personnel.
None
3 minutes Customer Service Specialist Field Reconnection - Main Office - CSS logs all Job Orders before forwarding to the Head of Field Services Section for distribution to respective field personnel who will do the reconnection.
- Sub-Offices - CSS logs all job orders for reconnection and informs via handheld radio the assigned Field personnel for the reconnection.
None
2 minutes - Customer Service Specialist
- Head- Field Services Section
Disconnector/Reconnector receives the Job Order and performs the reconnection on the prescribed schedule for padlocked accounts (3:00 p.m. – 5:00 p.m.).
None
15 minutes Disconnector / Reconnector - Main Office - CSS logs all Job Orders before forwarding to the Head of Field Services Section for distribution to respective field personnel who will do the reconnection.
- Sub-Offices - CSS logs all job orders for reconnection and informs via handheld radio the assigned Field personnel for the reconnection.
None
2 minutes - Customer Service Specialist
- Head- Field Services Section
Estimated Total Processing Time: 1 working day -
4. Reconnection of a Water Service Connection with Removed Meter that is Less than 3 Months Disconnected
- Office or Division: Customer Service Division and Finance Services Department (Cashiering Section)
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All Disconnected Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat with Removed Meter that is Less than 3 Months Disconnected.
Checklist of Requirements
- Statement of Account (SOA) or provides any account information (Account Number, Account Name)
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer presents the Statement of Account to the Customer Service Specialist (CSS) for Reconnection of disconnected account.
CSS checks the General Ledger for the date and type of disconnection of the account.
None 2 minutes Customer Service Specialist If the account is disconnected through removed meter, CSS creates a Ticket for Reconnection-Removed Meter followed by the creation of a Job Order which will include the following items: water meter, tailpiece and Teflon tape.
None 3 minutes Customer Service Specialist If the account is disconnected through removed meter, CSS creates a Ticket for Reconnection-Removed Meter followed by the creation of a Job Order which will include the following items: water meter, tailpiece and Teflon tape.
None 3 minutes Customer Service Specialist - If account is disconnected on the same day, only the total amount of water bill must be settled, reconnection fee is waived.
- If the customer requests for reconnection and pays after the disconnection date onwards, CSS should inform the customer of the P200 reconnection fee on top of the water bill arrears.
- Total amount of Water Bill arrears
- Total amount of Water Bill arrear + P200.00 Reconnection Fee
2 minutes Customer Service Specialist Customer presents slip and pays to Cashier After creating the ticket and printing the job order, CSS gives payment slip to the customer with the total amount to be paid.
Total amount as per payment slip 2 minutes - Customer Service Specialist
- Cashier
CSS signs on the printed Job Order for reconnection. CSS checks and indicates the OR Number on the Job Order.
None 2 minutes Customer Service Specialist After payment, CSS will change the status of the account from “DISCONNECTED” to “ACTIVE” in the system.
None 1 minute Customer Service Specialist CSS informs the customer that water service connection will be reconnected on the same day by the Field Personnel.
None 3 minutes Customer Service Specialist Field Reconnection - Main Office - CSS logs all Job Orders before forwarding to the Head of Field Services Section for distribution to respective field personnel who will do the reconnection.
- Sub-Offices - CSS logs all job orders for reconnection and informs via handheld radio the assigned Field personnel for the reconnection.
None 2 minutes - Customer Service Specialist
- Head of Field Services Section
Disconnector/Reconnector receives the Job Order, requests water meter from the warehouse and performs the reconnection of the account with removed meter
None 2 hours Disconnector / Reconnector - Main Office - CSS logs all Job Orders before forwarding to the Head of Field Services Section for distribution to respective field personnel who will do the reconnection.
- Sub-Offices - CSS logs all job orders for reconnection and informs via handheld radio the assigned Field personnel for the reconnection.
None 2 minutes - Customer Service Specialist
- Head of Field Services Section
Estimated Total Processing Time: 1 working day after the concessionaire settled obligations -
5. Reconnection of a Water Service Connection with Removed Meter or
Permanently Disconnected Meter that is More than 3 Months Disconnected
- Office or Division: Customer Service Division, Finance Services (Cashiering Section) and Engineering Department
- Classification: Complex
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All Disconnected Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat with Removed Meter or Permanently Disconnected Meter that is More than 3 Months Disconnected.
Checklist of Requirements
- Statement of Account (SOA) or provides any account information (Account Number, Account Name)
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer presents the Statement of Account to the Customer Service Specialist (CSS) for Reconnection of disconnected account.
CSS checks the General Ledger for the date and type of disconnection of the account.
None 2 minutes Customer Service Specialist CSS creates a ticket for Survey of Reconnection.
None 2 minutes Customer Service Specialist Lead man of surveyor gets all job orders from the Head of the Customer Services Section and distributes them to surveyors according to their area of assignment.
None 5 minutes - Lead man of Surveyor
- Head of Customer Services Section
Meets surveyor on site for actual survey.
Surveyor proceeds to site for actual survey of the disconnected account to identify if acceptable for reconnection and discusses with customer if there are fittings that needs to be replaced or missing to be indicated on the Cost of Fittings and Materials Form (CFMF).
None 15 minutes Field Surveyor Field Surveyor submits the CFMF for review & approval to the Head of the Field Services Section. Then, it shall be forwarded to the Head of the Customer Services Division for final approval.
None 10 minutes - Field Surveyor Head
- Field Services Section
- HHead-Customer Services Division
Customer reports back to office for creation of Job Order
CSS pulls out the CFMF from file and explains the details to the customer. If customer agrees with the payment of fees, the processing continues with the creation of ticket and job order for reconnection. CSS inputs the charges of reconnection fee and other necessary fittings as reflected in the CFMF. Ticket and Job Order to be transmitted to the Eng’g Department.
None 5 minutes Customer Service Specialist Customer presents the payment slip to the cashier and pays the total amount
After printing of the job order, CSS gives payment slip to the customer reflecting the total amount they need to pay, to be presented to the cashier.
Total amount as reflected on the payment slip 2 minutes - Customer Service Specialist
- Cashier
CSS signs on the printed Job Order for reconnection. CSS checks and indicates the OR Number on the Job Order.
None 2 minutes Customer Service Specialist After payment, CSS will change the status of the account from “DISCONNECTED” to “ACTIVE” in the system.
None 1 minute Customer Service Specialist CSS informs the customer that water service connection will be reconnected within 2 – 3 working days.
None 3 minutes Customer Service Specialist CSS gives the JO to the Head, Customer Services Section for forwarding to the Engineering Department.
None 5 minutes - Head - Customer Services Section
- Lead man - Maintenance Section
Engineering Lead man receives the Job Order Ticket and schedules the reconnection to Maintenance personnel.
None 2 minutes Lead man - Maintenance Section Maintenance personnel receives the Job Order, requests water meter and other necessary fittings from the warehouse and performs the reconnection of the account with removed meter.
None 2 hours - Lead man - Maintenance Section
- Maintenance personnel
Estimated Total Processing Time: 3 – 4 working days -
6. Service and Maintenance Requests
- Office or Division: Customer Service Division, Finance Services (Cashiering Section) and Engineering Department
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All Disconnected Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat with Removed Meter or Permanently Disconnected Meter that is More than 3 Months Disconnected.
Checklist of Requirements
- Information and details of the maintenance or service being requested may be obtained via SMS, telephone calls, hotline number reports/calls, written reports/requests or via personal visits to PWMC/MCWD
Where to Secure:
Customer/Concerned Citizen
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer provides the details of a specific service request he/she intends to report.
Customer Service Specialist (CSS) obtains the following information from the customer:
- Account name / number and complete address of the water service connection or the Name and Contact information of the person requesting the service.
- Description of damage or problem
None 3 minutes Customer Service Specialist (CSS) CSS creates a Ticket and makes a Job Order on the “Customer Services Utilities Management System” for the service request.
None 3 minutes Customer Service Specialist (CSS) CSS prepares Payment Slip for fees and charges, if any:
- For customers requesting voluntary disconnection, water bill/charges (if any) has to be settled prior the disconnection of the water service connection
- Fittings for charging or for replacement should be settled prior to repair or installation.
None 2 minutes Customer Service Specialist (CSS) Customer presents payment slip and pays fees and charges
Cashier receives payment Slip, accepts payment & issues Official Receipt (O.R.)
Water Bill plus fittings / other charges (if any) 2 minutes Cashier Customer presents O.R. to CSS as proof of payment for materials and charges
CSS informs customers of the duration of the service request/maintenance order.
None 1 minute Customer Service Specialist (CSS) CSS forwards the processed Job Order to Head of Customer Services Section for checking and logging and forwards the same to the Lead man - Maintenance Section and Lead man of Meter Maintenance/NSC Section for scheduling
None 1 minute - Customer Service Specialist
- CS Supervisor
- Lead Man - Meter Maintenance/NSC Section
- Lead Man - Maintenance Section
Lead man- Maintenance Section and Lead man of Meter Maintenance/NSC Section receives and distributes the job orders to maintenance personnel for execution of job order request.
None - 4 - 8 hours for Service Request
- 1- 3 hours for Maintenance Request
- Lead Man - Meter Maintenance/NSC Section
- Lead Man - Maintenance Section
Estimated Total Processing Time: - For Service Request: within 24 hrs. (under normal condition, except Restoration)
- For Maintenance Request: 2 to 3 working days (under normal condition)
Other Services
-
1. Senior Citizen’s Utility Discount
- Office or Division: Customer Service Division
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen)
- Who may avail: All qualified senior citizen Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat.
Checklist of Requirements
-
Valid I.D. for proof of age and citizenship
- Senior Citizen I.D. issued by Mabalacat City Office of the Senior Citizen Affairs (OSCA)
- Philippine Passport
- Driver's License
- Voter's I.D.
- SSS / GSIS
- PRC I.D.
- Postal I.D.
-
Proof of Billing
- Latest PWMC / MCWD Statement of Account
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer inquires how to avail the service.
Customer Service Specialist (CSS) discusses process and requirements.
None 5 minutes Customer Service Specialist (CSS) CSS asks applicant if the service connection being applied for senior citizen discount is under the name of the senior citizen applicant.
If Yes, proceed to Step 3. If No, suggest and discuss the process of Change Name service to applicant (Refer to Change Name service process).
None 1 minute Customer Service Specialist (CSS) CSS checks completeness, accuracy, and validity/authenticity of applicant’s submitted requirements.
None 2 minutes Customer Service Specialist (CSS) CSS updates the customer’s ledger in the system to reflect the senior citizen discount.
None 1 minute Customer Service Specialist (CSS) Estimated Total Processing Time: 9 minutes -
2. Request for Change of Account Name
- Office or Division: Customer Service Division, and Finance Services (Cashiering Section)
- Classification: Simple
- Type of Transaction: P2C (PrimeWater to Citizen), P2B (PrimeWater to Business), P2G (PrimeWater to Government)
- Who may avail: All Concessionaires of Mabalacat City Water District and PrimeWater Mabalacat.
Checklist of Requirements
- Proof of ownership
- Valid ID of previous owner
- Valid ID of applicant
Where to Secure:
Customer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Customer inquires how to avail the service.
Customer Service Specialist (CSS) discusses process & requirements.
None 3 minutes Customer Service Specialist (CSS) Customer applies and submit requirements
CSS checks completeness, accuracy, and validity/authenticity of applicant’s submitted requirements.
None 2 minutes Customer Service Specialist (CSS) CSS updates the customer’s information in the CSUMS to reflect the name of the new account holder.
None 1 minute Customer Service Specialist (CSS) CSS prepares ticket for the job order of change name. CSS prints two (2) copies (1 for cashier, 1 to be attached in the change name contract).
None 2 minutes Customer Service Specialist (CSS) Customer pays change name fee to Cashier and presents Official Receipt (OR) to CSS.
Cashier issues O.R.
Relative of previous owner - P200.00, if not, P700.00
6 minutes Cashier Customer signs the contract.
CSS processes water service connection contract.
None 10 minutes Customer Service Specialist (CSS) Estimated Total Processing Time: 24 minutes
Mabalacat City Water District
Internal Services
-
1. Recruitment and Selection Procedure
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Highly Technical
- Type of Transaction: G2C – Government to Citizen
- Who may avail: All qualified and interested applicants
Checklist of Requirements
- Cover Letter/Application Letter
- Fully accomplished Personal Data Sheet with recent passport sized picture (CS Form #212, revised 2018) which can be downloaded at www.csc.gov.ph
- Performance Rating (latest)
- Photocopy of certificate of eligibility/rating/license
- Photocopy of Transcript of Records
Where to Secure:
Applicant
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Prepare Request of Publication of Vacant Positions (CSC Form #9) to be signed by the GM.
None 5 minutes AGSO A Submit signed CSC Form No. 9 to CSC Field Office for publication at CSC Website and to be posted at the MCWD website, MCWD Bulletin Boards, and in at least three (3) conspicuous places within the agency.
None - 3 hours
- At least 10 calendar days for publication/posting
AGSO A Prepare memorandum to notify interested employees within the agency and have it signed by the GM.
None 2 minutes AGSO A Apply for the desired position and submit complete requirements.
Received applications and submitted documentary requirements and verifies them as to its completeness.
None 2 minutes / applicant AGSO A Prepare detailed list of applicants for submission to HRMPSB.
None 10 minutes - AGSO A
- HRMPSB Secretariat
Evaluate and screened applications and prepare shortlisted candidates list to be sent Notice of Examination.
None 3 minutes / applicant - AGSO A
- HRMPSB Secretariat
- Received Notice of Examination Letter indicating the time and date of examination (qualified applicants).
- Received Thank you letter (non-qualified applicants)
Prepare and send Notice of Examination for qualified applicants and Thank you letter for non-qualified applicants.
None 2 minutes / applicant - AGSO A
- HRMPSB Secretariat
Appear personally on the scheduled date of examination and interview
Administer Applicants Examination and Interview.
None Exam / Interview - 3 days HRMPSB Evaluation, deliberation, ranking and endorsement of qualified applicants.
None 2 hours HRMPSB Selection of qualified applicants from the HRMPSB Ranking.
None 1 hour General Manager Received list of additional requirements
Advise selected applicant of additional requirements, if any.
None 2 minutes / appointee AGSO A Submit complete additional requirements
Receive and verify submitted additional requirements and inform the appointee on start date and schedule of orientation and oath of office.
None 3 minutes AGSO A Attend new employee orientation
Facilitate new employee orientation.
None 4 hours SIRDO A Prepare appointment papers / documents for signature.
None 4 hours SIRDO A Signed appointment papers.
None 5 minutes - HRMPSB Chairman
- HRMO
- General Manager
Sign appointment papers Submit signed appointment papers to CSC field office (within 30 days upon oath of office and assumption of duty).
None 3 hours AGSO A Estimated Total Processing Time: 13 days 16 hours & 34 minutes -
2. Release of Terminal Leave Benefits Procedure
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2C – Government to Citizen
- Who may avail: Resigned/Retired/Separated employees of Mabalacat City Water District
CHECKLIST OF REQUIREMENTS WHERE TO SECURE Duly accomplished and signed Clearance Form Human Resources Section GSIS Clearance Government Service Insurance System Exit Statement of Assets, Liabilities and Net worth Applicant Duly accomplished TLB application Applicant Notarized copy of:
- Affidavit of Undertaking to deduct all financial obligations, if any
- Sworn Statement of No Pending Case
Applicant CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Upon acceptance of resignation or approval of retirement, secure a clearance form, Leave form, Affidavit of Undertaking to deduct all financial Obligations and Sworn Statement of No Pending Case from HR section
Provide the following forms and templates :
- Employee Clearance Form
- Affidavit of Undertaking
- Sworn Statement
- Leave Form
None 30 minutes AGSO A - Fill out the forms completely and have them signed by concerned departments
- Have the undertaking and sworn statement notarized
- Secure clearance from GSIS or Certificate of Loan Balance, if applicable
- Prepare exit SALN
None Upon submission of all required documents Applicant Once complete, submit all the requirements for processing
Received, check and validate all documents submitted
None 25 minutes AGSO A If documents submitted are complete:
- Compare TLB with GSIS Loan balance (if any)
- If no loan, prepare computation of Terminal Leave Benefits, Certificate of Leave Balance and Request for Check Preparation, have them signed and submit to Finance Department
- If TLB greater than loan, advise Finance dept. to prepare check payable to the applicant and GSIS and provide the payable amount for each.
- If TLB lesser than loan, inform Finance dept. to prepare check payable to GSIS
None 20 minutes AGSO A Verifies the Completeness of Documents, if okay, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher, have them sign and Send to Cashier for check preparation
None 10 minutes - Sr. Corporate Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Issue check and have it sign by the authorized signatories
None 5 minutes Cashier If applicable, receive the check and acknowledge receipt on the voucher
Release the check and ask to acknowledge on the Disbursement Voucher
None 1 minute Cashier Estimated Total Processing Time: 1 hour 31 minutes -
3. Acceptance of Payments/Collections
- Office or Division: Finance Office/Section
- Classification: Complex
- Type of Transaction: G2C-Government to Citizen, G2B- Government to Business
-
Who may avail:
- Former employees of MCWD with Disallowances
- Current employees of MCWD with excess Cash Advance
- Private Partner of MCWD
Checklist of Requirements
- Former and Current Employees: Full name
-
Private Partner:
- Complete set of Voucher with details of payment
- Transmittal Summary of MCWD Official Water Bill Receipt
- With Complete Attached Blue copy
Where to Secure:
Payor
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Present SOA or other required documents
Validate amount due and verify account information.
None 3 minutes Cashier Pay the amount due
- Receive, count and Validate authenticity of bills for cash payment.
- Receive and verify check amount and completeness of details and signatures for Check Payment
Depends on validated amount due 2 minutes Cashier Secure copy of Official Receipt
Print and Issue Official Receipt
None 2 minutes Cashier Estimated Total Processing Time: 7 minutes -
4. Processing of Payment for Regular Transactions with Purchase Request (PR) and Purchase Order (PO)
- Office or Division: Finance Office/Section, Property Section and Office of the General Manager
- Classification: Simple
- Type of Transaction: G2C-Government to Citizen, G2B-Government to Business, G2G-Government to Government
- Who may avail: Suppliers, Government Offices/Agencies and Other Private Companies and Individuals
Checklist of Requirements
-
Supplier:
- Signed Purchase Order
- Billing Statement/Statement of Account
- Delivery Receipt
- Sales Invoice
-
Inventory Custodian:
- Purchase Request
- Purchase Order/Job Order
- Pre and Post Repair Report (if applicable)
- Waste Report (if applicable)
- Quotation or Bidding document (whichever is applicable)
Where to Secure:
Supplier
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Deliver goods/services together with Billing Statement or Sales Invoice and Delivery Receipt
Check and inspect goods received versus the items indicated in the billing statement or sales invoice and delivery receipt.
None 30 minutes Supervising Materials Planning Officer Transmit all required documents for check processing to Finance Personnel.
None 2 minutes Supervising Materials Planning Officer Check completeness and validate all documents received.
None 10 minutes Des. Administration Service Assistant C Prepare Budget Requisition Status to Generate Budget Utilization Request.
None 5 minutes Des. Corporate Budget Specialist B Prepare Journal Entry Voucher (JEV) and Disbursement Voucher (DV) and Withholding Tax Certificate.
None 5 minutes Sr. Corp. Accountant C Review the completeness and accuracy of supporting documents. Sign on the DV, JEV and other relevant documents.
None 3 minutes Chief Corp. Accountant B Prepare Bank Check and transmit to the Office of General Manager.
None 3 minutes Cashier Approve the DV and sign the Bank Check.
None 2 minutes General Manager Receive Bank Check and acknowledge receipt by signing at Received portion of Disbursement Voucher.
Receive and release the duly signed Bank Check.
None 2 minutes Cashier Estimated Total Processing Time: 1 hour 2 minutes
External Services
-
5. Request for Documents by PrimeWater
- Office or Division: Office of the General Manager
- Classification: Simple
- Type of Transaction: G2P – Government to PrimeWater
- Who may avail: Authorized Employee of PrimeWater Mabalacat
Checklist of Requirements
- Request Letter
Where to Secure:
Mabalacat City Water District
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit Letter requesting for pertinent documents
Accept Letter and acknowledge receive thereof.
None 2 minutes - Records Assistant
- Executive Assistant
Endorse letter to the General Manager.
None 1 minute Executive Assistant Approve/Deny the request for documents.
None 2 minutes General Manager Photocopy the requested documents and stamps it at Certified True Copy of the original document.
None 10 minutes Records Assistant Accept the requested document and acknowledges receipt
Issue the requested document to PrimeWater Employee.
None 2 minutes Records Assistant Estimated Total Processing Time: 17 minutes -
6. Acceptance of Reports and Other Communications by PrimeWater
- Office or Division: Office of the General Manager
- Classification: Simple
- Type of Transaction: GG2P – Government to PrimeWater
- Who may avail: Authorized Employee of PrimeWater Mabalacat
Checklist of Requirements
- Reportorial Obligation
- Various Communications
Where to Secure:
Mabalacat City Water District
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit Reports required from PrimeWater Mabalacat under the JVA
Accept report/s and acknowledge receipt thereof.
None 2 minutes Records Assistant Photocopy and endorse Report to the Office of the General Manager.
None 10 minutes Records Assistant Receive and conduct initial review of the report and endorse it to the General Manager.
None 3 minutes Executive Assistant Evaluate Report and endorses to concerned CMU Personnel for filing and monitoring.
None 10 minutes General Manager File and docket original document.
None 3 minutes Records Assistant Estimated Total Processing Time: 28 minutes -
7. Procedure on Asset Management Supervision
- Office or Division: Engineering and Maintenance Division
- Classification: Complex
- Type of Transaction: G2G (Government to Government)
- Who may avail: Contract Monitoring Unit of Mabalacat City Water District (MCWD)
Checklist of Requirements
Complete List of Mabalacat City Water District Facilities and PrimeWater Facilities with indicated details:- Status of Facilities and Equipment
- Report and recommendation to maintain good condition of Assets
Where to Secure:
- Finance Section of Mabalacat City Water District
- PrimeWater of Mabalacat City (PrimeWater)
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Provide the complete list of facilities currently in use for operations with complete details
Receive and review the complete list of facilities with complete details.
None 30 minutes Water/Sewerage Maintenance General Foreman Assist MCWD Engineer during actual inspection
Coordinate with PrimeWater and inspect the Facilities to determine if said assets are kept in good condition.
None 3 days Water/Sewerage Maintenance General Foreman Prepare report on the result of actual inspection.
None 4 hours Water/Sewerage Maintenance General Foreman Make recommendations to maintain or improve condition of assets.
None 4 hours Water/Sewerage Maintenance General Foreman Discuss to the General Manager results of inspection.
None 30 minutes Water/Sewerage Maintenance General Foreman Discuss with PrimeWater Branch Manager the action plan to be taken.
None 2 hours General Manager Estimated Total Processing Time: 4 days & 3 hours -
8. Project Implementation Monitoring
- Office or Division: Engineering and Maintenance Division / OGM
- Classification: Simple
- Type of Transaction: G2G (Government to Government)
- Who may avail: Contract Monitoring Unit of Mabalacat City Water District (MCWD)
Checklist of Requirements
- Project Scope
- Plans and Specifications
- Program of Works
- Project Timeline
- Progress Report
Where to Secure:
- PrimeWater of Mabalacat City (PrimeWater)
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Provide the list with comprehensive details of Proposed Projects
Receive and review the complete list of Proposed Project(s)
None 1 hour Water/Sewerage Maintenance General Foreman Discuss details of proposed project(s) to MCWD and provide progress report
Inspect the location of proposed project
None 1 hour Water/Sewerage Maintenance General Foreman Monitor the development of the project and make a progress report
None 4 hours Water/Sewerage Maintenance General Foreman Attend to the discussion with regards to the progress of the project
Discuss with PrimeWater Branch Manager if there are significant variations with respect to the implementation of the project, if any
None 2 hours General Manager Estimated Total Processing Time: 8 hours -
9. Water Quality Monitoring
- Office or Division: Engineering and Maintenance Division
- Classification: Simple
- Type of Transaction: G2G - Government to Government (MCWD to LGU, LWUA)
- Who may avail: Mabalacat City Water District (MCWD), Mabalacat City Health Office (CHO), Local Water Utilities Administration (LWUA)
Checklist of Requirements
- Daily Residual Chlorine Test Results
- Monthly Bacteriological Test Results
- Semi-annual Physical and Chemical Test Results
- Annual Water Potability Certificate
Where to Secure:
- PrimeWater of Mabalacat City (PrimeWater)
- Mabalacat City Health Office (CHO)
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Initiate the residual chlorine testing and water sampling
Witness sixty (60) random concessionaire water sampling for residual chlorine and bacteriological testing
None 6 hours Water/Sewerage Maintenance General Foreman Provide the complete Test Reports
Receive and review the complete list of Test Reports
None 1 hour Water/Sewerage Maintenance General Foreman Submit the Test Reports to City Health Office (CHO) and to LWUA
None 1 hour Water/Sewerage Maintenance General Foreman Request and secure Water Potability Certificate from CHO
None 2 hours Water/Sewerage Maintenance General Foreman Estimated Total Processing Time: 10 hours -
10. Request for Personnel Records Procedure
(Certificate of Employment, Service Record and other Personnel related Documents)
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2C – Government to Citizen
- Who may avail: Present and Former employees of Mabalacat City Water District
Checklist of Requirements
Formal Request (personal appearance either verbal or written):- Complete Name and purpose of request
- Authorization Letter, if done thru representative
- Valid ID
Where to Secure:
- Applicant
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Personally Submit Request or thru Representative
Validate request, locate and verifies records thru employee 201 files
None 15 minutes AGSO A Prepare/encode and generate requested document and have it signed by authorized signatories
None 20 minutes AGSO A Review, approve and sign the requested document
None 5 minutes - SIRDO A
- General Manager
Received requested document
Verify the valid ID presented and release the requested document
None 3 minutes AGSO A Estimated Total Processing Time: 43 minutes -
11. Payroll Processing Procedure
-
11.A: Contract Of Service (COS)
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2G – Government to Government
- Who may avail: All Mabalacat City Water District Employees
Checklist of Requirements
- Daily Attendance Summary
- Accomplishment Report
Where to Secure:
Contract of Service Employees
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit requirements duly certified by immediate supervisor
Verifies daily attendance in the system and logbook, if applicable and deduct applicable absences or tardiness.
None 20 minutes AGSO A Prepares payroll summary computation based on attendance.
None 3 minutes AGSO A Generate payroll summary and have it signed by authorized signatories.
None 5 minutes AGSO A Check, verify and signed payroll summary and forward to Finance for check preparation.
None 2 minutes SIRDO A Prepares Request for Check preparation.
None 1 minute AGSO A Verifies the Completeness of Documents, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher and Send to Cashier for check preparation.
None 10 minutes - AGSO A
- Sr. Corp. Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Prepares check and have it signed by authorized signatories.
None 5 minutes Cashier Verifies of cash received, signed and acknowledge receipt of payroll
Encashed check and distribute pay envelopes to employees.
None 30 minutes Cashier Estimated Total Processing Time: 1 hour 16 minutes -
11.B: Permanent Employees
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2G – Government to Government
- Who may avail: All Mabalacat City Water District Employees
Checklist of Requirements
- Daily Attendance Summary
Where to Secure:
Regular/Permanent Employees
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Initiate payroll preparation and post all payroll deductions in the payroll system
None 10 minutes AGSO A Generate all payroll related documents and have them signed by authorized signatories
None 5 minutes AGSO A Check, verify and signed payroll documents and forward to Finance for check preparation
None 2 minutes SIRDO A Verifies the Completeness of Documents, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher and Send to Cashier for check preparation
None 10 minutes - AGSO A
- Sr. Corp. Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Prepares check and have it signed by authorized signatories
None 5 minutes Cashier Verifies and Sign payroll documents DV and check issued
None 2 minutes General Manager Submit to bank for crediting to individual employee accounts
None 25 minutes Cashier Prepare and Issue Payslips
None 10 minutes AGSO A Estimated Total Processing Time: 1 hour 9 minutes
-
11.A: Contract Of Service (COS)
-
12. Leave Application Procedure
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2G – Government to Government
- Who may avail: All Permanent/Casual/Contractual Employees
CHECKLIST OF REQUIREMENTS WHERE TO SECURE Duly Accomplished Leave Form (Civil Service Form No. 6) Human Resources Section Additional Requirements:
- Medical Certificate (for Sick Leave)
- Certificate of Live Birth (for Maternity/Paternity)
- Marriage Contract
- Medical Parctitioner/Hospital/Clinic
- PSA/Local Civil Registrar
- PSA/Local Civil Registrar
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Secure CS Form No 6, fill out completely and submit to HR Section
Issue Civil Service Form No 6 (Leave Application Form)
None 1 minute AGSO A Fill out the leave balance certification part and have it signed
None 3 minutes AGSO A Verifies leave balance and signed the certification
None 2 minutes SIRDO A Submit to the office of the GM for approval
None 2 minutes AGSO A Review and approve/disapprove the Leave application
None 2 minutes General Manager Received Notice of Approved/disapproved Leave
Notify employee and record leave in the system
None 3 minutes AGSO A Estimated Total Processing Time: 13 minutes -
13. Request for Monetization of Leave Credits Procedure
- Office or Division: Administrative Services Dept - Human Resources Section
- Classification: Simple
- Type of Transaction: G2C – Government to Citizen
- Who may avail: All Active and qualified employees of Mabalacat City Water District
Checklist of Requirements
-
10 days VL Monetization
- Duly accomplished and signed application Form
-
50% or more VL/SL Monetization
- Approved Letter of Request
- Duly accomplished and signed application Form
Where to Secure:
- Applicant
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Secure, fill-out and submit an Application Form to the Human Resource Section, attached supporting documents, if necessary
Issue Application Form and verifies employee’s leave balances
None 2 minutes AGSO A Secure, fill-out and submit an Application Form to the Human Resource Section, attached supporting documents, if necessary
Process leave details on the application form and submit for approval
None 3 minutes AGSO A Secure, fill-out and submit an Application Form to the Human Resource Section, attached supporting documents, if necessary
Validate, Review, sign the application form and send to the OGM for approval.
None 2 minutes SIRDO A Secure, fill-out and submit an Application Form to the Human Resource Section, attached supporting documents, if necessary
Review, Approve (or disapprove), and affix signature
None 5 minutes General Manager Once approved, prepare request for check preparation and submit to Finance
If disapproved, advise applicant of the decision
None 3 minutes AGSO A Verifies the Completeness of Documents, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher and Send to Cashier for check preparation
None 10 minutes - AGSO A
- Sr. Corp. Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Prepares check and have it signed by authorized signatories
None 5 minutes Cashier Received check and acknowledge receipt on the DV
Issue check and have the DV signed received by recipient
None 1 minute Cashier Estimated Total Processing Time: 31 minutes -
14. Supplies Issuance Process
- Office or Division: General Services Office
- Classification: Simple
- Type of Transaction: G2P (Government to PrimeWater), G2C (Government to Citizen)
- Who may avail: MCWD Employees and PrimeWater
Checklist of Requirements
- Requisition and Issuance Slip (RIS) for MCWD Employees
- PrimeWater Requisition Slip (PRS) for PrimeWater
Where to Secure:
- Requisitioning Officer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Present RIS/PRS
Verify availability of items listed for requisition in the Total Work Management System (TWMS)
None 1 minute Warehouse Assistant - For PrimeWater: Prepare RIS of the items listed for requisition and attach PRS.
- For MCWD employees: proceed to next step
- None
- None
30 minutes Warehouse Assistant Assign RIS number
None 2 minutes Warehouse Assistant Check items listed for requisition
None 2 minutes Supervising Materials Planning Officer Check and inspect items to be issued
None 5 minutes Supervising Materials Planning Officer Secure approval of the General Manager
None 3 minutes Supervising Materials Planning Officer Encode RIS to TWMS
None 10 minutes Warehouse Assistant Receive items requested
Issue items requested and ensure that requisitioning officer has acknowledged receipt of items in the RIS.
None 5 minutes - Supervising Materials Planning Officer
- Warehouse Assistant
Estimated Total Processing Time: 58 minutes -
15. Procurement Process - P50,000.00 and Below
- Office or Division: General Services Office
- Classification: Simple
- Type of Transaction: G2G (Government to Government, G2B (Government to Business), G2C (Government to Citizen)
- Who may avail: MCWD Department Heads
Checklist of Requirements
- Purchase Request (PR)
Where to Secure:
- Requisition Officer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit PR to Supervising Materials Planning Officer
Review document submitted
None 1 minute Supervising Materials Planning Officer Encode Purchase Request in the Total Warehouse Management System (TWMS) and prepare Supply Availability Inquiry (SAI)
None 20 minutes Supervising Materials Planning Officer Transmit PR and SAI to Finance Department for the issuance of Budget Utilization Request (BUR)
None 2 minutes Supervising Materials Planning Officer Receive PR, SAI and BUR from Finance Department and secure the approval of the General Manager
None 5 minutes - Supervising Materials Planning Officer
- General Manager
Prepare Request For Quotation (RFQ) and canvass to at least 3 suppliers. Ensure that all information in the RFQ are properly filled out by suppliers
None 1 day Supervising Materials Planning Officer Prepare Abstract of Quotation and determine the lowest price or supplier that has met the product specification in the PR
None 1 hour Supervising Materials Planning Officer Secure approval of the Head of the Agency on AOQ
None 3 minutes - Supervising Materials Planning Officer
- General Manager
Under the TWMS, prepare Purchase Order
None 5 minutes Supervising Materials Planning Officer Endorse for approval of Purchase Order
None 3 minutes - Supervising Materials Planning Officer
- General Manager
Secure confirmation of supplier
None 2 hours Supervising Materials Planning Officer Transmit all documents mentioned above to Finance Department for check preparation
None 2 minutes Supervising Materials Planning Officer Verifies the Completeness of Documents, if okay, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher, have them sign and Send to Cashier for check preparation
None 30 minutes - Sr. Corporate Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Issue check and have it sign by the authorized signatories
None 5 minutes Cashier Issue check and have it sign by the authorized signatories
None 5 minutes Cashier Receive items procured, compare actual items against specifications ordered and under TWMS encode the items and prepare Store Receiving Slip and Inspection & Acceptance Report
None 30 minutes - Supervising Materials Planning Officer
- Warehouse Assistant
Receive procured item Have the item procured inspected by the enduser and release the item procured
None 5 minutes - Supervising Materials Planning Officer
- Warehouse Assistant
Estimated Total Processing Time: 1 day, 4 hours & 51 minutes -
16. Procurement Process for Ordinary or Regular Office Supplies and Equipment not Available in
the DBM-PS with ABC’s above P50,000.00 but not more than P250,000.00 (Shopping)
- Office or Division: General Services Office
- Classification: Simple
- Type of Transaction: G2G (Government to Government, G2B (Government to Business), G2C (Government to Citizen)
- Who may avail: MCWD Department Heads
Checklist of Requirements
- Purchase Request (PR)
Where to Secure:
- Requisition Officer
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit PR to Supervising Materials Planning Officer
Review document submitted
None 1 minute Supervising Materials Planning Officer Encode Purchase Request in the Total Warehouse Management System (TWMS) and prepare Supply Availability Inquiry
None 20 minutes Supervising Materials Planning Officer Transmit PR and SAI to Finance Department for the issuance of Budget Utilization Request (BUR)
None 2 minutes Supervising Materials Planning Officer Receive PR, SAI and BUR from Finance Department and secure the approval of the Head of the Agency
None 5 minutes - Supervising Materials Planning Officer
- General Manager
Upon receipt of PR,SAI and BUR, post in the Philgeps website for at least (3) three calendar days, prepare RFQs and canvass to at least three (3) suppliers of known qualifications
None 1 day Supervising Materials Planning Officer Gather all quotations submitted after the duration of publication and prepare Abstract of Quotation (AOQ), check for completeness and validity of documents submitted and determine the lowest price or the supplier that has met the specifications and other terms and conditions.
None 1 hour - BID and Awards Committee (BAC)
- Supervising Materials Planning Officer
Secure approval of the Head of the Agency on AOQ.
None 3 minutes - Supervising Materials Planning Officer
- General Manager
Prepare Purchase Order (PO)
None 5 minutes Supervising Materials Planning Officer Endorse approval of PO
None 3 minutes - Supervising Materials Planning Officer
- General Manager
Secure confirmation of supplier on PO
None 2 hours Supervising Materials Planning Officer Transmit all documents to Finance Department for check preparation
None 3 minutes Supervising Materials Planning Officer Verifies the Completeness of Documents, if okay, Prepare Budget Requisition and Status, Generate Budget Utilization Request, Prepare Journal Entry Voucher and Disbursement Voucher, have them sign and Send to Cashier for check preparation
None 30 minutes - Sr. Corporate Accountant
- Corp. Budget Specialist
- Chief Corporate Accountant
Issue check and have it sign by the authorized signatories
None 5 minutes Cashier Receive items procured, compare actual items against specifications ordered and under TWMS encode the items and prepare Store Receiving Slip and Inspection and Acceptance Report
None 30 minutes - Warehouse Assistant
- Supervising Materials Planning Officer
Receive procured item Have the item procured inspected by the end-user and release the item procured and ensure to acknowledge receipt in RIS
None 5 minutes - Warehouse Assistant
- Supervising Materials Planning Officer
Estimated Total Processing Time: 1 day, 4 hours & 51 minutes -
17. Processing of Request for Petty Cash Fund
- Office or Division: Finance Office/Section
- Classification: Simple
- Type of Transaction: G2C-Government to Citizen
- Who may avail: Current employees of MCWD
Checklist of Requirements
- Duly Approved Petty Cash Voucher (PCV) Form
Where to Secure:
- Requesting Employee
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Get and Accomplish Request for Petty Cash Form
- Particulars – details of the expenditure
- Amount – requested amount
- Requested By - employee’s name and signature
Issue Request for Petty Cash Form
None 3 minutes Cashier Secure Approval of Petty Cash request from Immediate Supervisor
Immediate Supervisor approves/disapproves request for Petty Cash Form
None 2 minutes Immediate Supervisor of requesting employee Submit duly approved Request for Petty Cash Form and wait for the release of cash
Receive and validate Request form
None 1 minute Cashier Receive cash and acknowledge receipt
Release requested Petty cash and have it acknowledged
None 1 minute Cashier Estimated Total Processing Time: 7 minutes -
18. Petty Cash Liquidation
- Office or Division: Finance Office/Section
- Classification: Simple
- Type of Transaction: G2C-Government to Citizen
- Who may avail: Current employees of MCWD
Checklist of Requirements
- Official Receipt/Sales Invoice
Where to Secure:
- Requestor
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit Official Receipt or Sales Invoice and return excess cash (if applicable)
Attach accomplished Request for Petty Cash Form
None 2 minutes Cashier Submit Official Receipt or Sales Invoice and return excess cash (if applicable)
Check completeness and accuracy of supporting documents for liquidation and account cash returned, if any
None 2 minutes Cashier Submit Official Receipt or Sales Invoice and return excess cash (if applicable)
Fill out the Petty Cash Form
None 4 minutes Cashier Accomplish Part D of Petty Cash form. Check the box for Liquidation or Reimbursement and Sign the voucher
Release cash for Reimbursement (if applicable)
None 2 minutes Cashier Estimated Total Processing Time: 10 minutes -
19. Processing of Payment for Reimbursement of Expenses
- Office or Division: Finance Office/Section and Office of the General Manager
- Classification: Simple
- Type of Transaction: G2C-Government to Citizen, G2B-Government to Business, G2G-Government to Government
- Who may avail: Suppliers, Government Offices/Agencies and Other Private Companies and Individuals
Checklist of Requirements
- Official Billing Statement/Statement of Account
- Invoice of payee (if applicable)
- Valid Official Receipt (if applicable)
Where to Secure:
- Requestor
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Submit all documents based from the Checklist requirement.
Check completeness and validate all documents received
None 10 minutes Des. Administration Service Assistant C Submit all documents based from the Checklist requirement.
Prepare Budget Requisition Status to Generate Budget Utilization Request
None 5 minutes Des. Corporate Budget Specialist B Submit all documents based from the Checklist requirement.
Prepare Journal Entry Voucher (JEV) and Disbursement Voucher (DV)
None 5 minutes Sr. Corp. Accountant C Submit all documents based from the Checklist requirement.
Review the completeness and accuracy of supporting documents. Sign on the DV, JEV and other relevant documents
None 3 minutes Chief Corp. Accountant B Submit all documents based from the Checklist requirement.
Prepare Bank Check and transmit to the Office of General Manager
None 5 minutes Cashier Submit all documents based from the Checklist requirement.
Approve the DV and sign the Bank Check
None 5 minutes General Manager Receive Bank Check and acknowledge receipt by signing at Received portion of Disbursement Voucher.
Receive and release the duly signed Bank Check
None 2 minutes Cashier Estimated Total Processing Time: 35 minutes -
20. Application for Grant of Cash Advance
- Office or Division: Finance Office/Section and Office of the General Manager
- Classification: Simple
- Type of Transaction: G2G-Government to Government
- Who may avail: Bonded Employees of MCWD
Checklist of Requirements
- Estimate of Expense
- Certification from Accountant (no outstanding or unliquidated cash advances)
Where to Secure:
- Requesting Employee
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Prepare and submit Estimate of Expense.
Check the correctness and appropriateness of Estimate of Expense
None 5 minutes Des. Administration Service Assistant C Prepare and submit Estimate of Expense.
Prepare and make a Certification that the previous Cash Advance have been liquidated and accounted for
None 5 minutes Chief Corporate Accountant B Prepare and submit Estimate of Expense.
Prepare Budget Requisition Status to Generate Budget Utilization Request
None 5 minutes Des. Corporate Budget Specialist B Prepare and submit Estimate of Expense.
Prepare Journal Entry Voucher (JEV) and Disbursement Voucher (DV)
None 5 minutes Sr. Corp. Accountant C Prepare and submit Estimate of Expense.
Review the completeness and accuracy of supporting documents. Sign on the DV, JEV and other relevant documents
None 3 minutes Chief Corp. Accountant B Prepare and submit Estimate of Expense.
Prepare Bank Check and transmit to the Office of General Manager
None 5 minutes Cashier Prepare and submit Estimate of Expense.
Approve the DV and sign the Bank Check
None 5 minutes General Manager Receive Bank Check and acknowledge receipt by signing at Received portion of Disbursement Voucher
Receive and release the duly signed Bank Check
None 2 minutes Cashier Estimated Total Processing Time: 35 minutes -
21. Liquidation of Cash Advance
- Office or Division: Finance Office/Section and Office of the General Manager
- Classification: Simple
- Type of Transaction: G2G-Government to Government
- Who may avail: Bonded Employees of MCWD
Checklist of Requirements
- Official Receipt
- Summary of Expenses
- Liquidation Report
Where to Secure:
- Requesting Employee
CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME RESPONSIBLE PERSON Prepare and submit Liquidation Report and Summary of Expenses together with Official Receipt or Sales Invoice. Return excess cash advance if any
Evaluate and verify submitted documents
None 5 minutes Des. Administration Service Assistant C Receive and count excess cash advance
None 5 minutes Cashier Prepare Budget Requisition Status to Generate Budget Utilization Request
None 5 minutes Des. Corporate Budget Specialist B Prepare Journal Entry Voucher (JEV)
None 5 minutes Sr. Corp. Accountant C Review the completeness and accuracy of supporting documents. Sign on the JEV and other relevant documents
None 3 minutes Chief Corp. Accountant B Approve and sign the JEV
None 3 minutes General Manager Estimated Total Processing Time: 26 minutes
How to File a Complaint/Query
You can tell us your views in the following ways:
- Visit the PWMC/MCWD Main or Sub-Offices and inform the Customer Services Officer of your complaint, comments, queries, or suggestions.
- We highly encourage customers to accomplish the Customer Satisfaction Feedback Form (CSFF) provided by the Customer Service Section or Cashier Area of the PWM/MCWD Main and Sub-Offices. To ensure the privacy of their feedback, customers may request sealable envelope and drop the accomplished CSFF to the box provided.
-
Call PWMC/MCWD Main or Sub-Offices:
- Landline: (045) 331-7404
- Mobile Hotlines:
- Globe: 0916-646-1658 (24/7)
- Smart: 0939-104-7640 (24/7)
- Sun: 0943-440-5542 (Mondays to Fridays, 8:00 A.M. to 5:00 P.M.)
- Send a message via Facebook: https://www.facebook.com/PrimeWaterMabalacat
-
You may also write your concern to:
-
ENGR. HECTOR V. AGUILAR
General Manager
Mabalacat City Water District
0255 MacArthur Highway, Mabiga, Mabalacat City, Pampanga -
ENGR. MARIA LOURDES I. GALVEZ
Branch Manager
PrimeWater Mabalacat City
0255 MacArthur Highway, Mabiga, Mabalacat City, Pampanga
-
ENGR. HECTOR V. AGUILAR
PWMC/MCWD will respond accordingly the soonest time possible on any receipt of an inquiry or complaint. We appreciate the confidence you have placed in us and we look forward to providing you with the best possible service.